Completed July 2011

An entirely new N+1 offsite data center for Tift Regional Medical Center. Two 600 kW Cummins gensets with provisions for a third; two 500 kW APC UPS systems, each with three 300 kVA power distribution units (PDUs) feeding six remote power panels (RPPs) on the floor.