TRMC ED Tower

2021 · 82,000 sq ft renovated + 172,000 sq ft new · General Contractor: JE Dunn

TRMC has opened a transformational 172,000-square-foot Emergency Department and Bed Tower on its campus, paired with 82,000 square feet of renovations to the existing first, second, and third floors and kitchen.

Floor-by-Floor Program

Level 1 of the new tower is the heart of emergency care and patient services. It houses the newly relocated ER entrance with direct access to a courtyard, a modern kitchen and dining area, coffee shop and gift store, and administrative offices. The emergency department itself features 43 exam rooms, 3 fully equipped trauma rooms with dedicated imaging capability, an X-ray room, and two CT scan rooms. Level 1 also includes a new helicopter landing pad to support critical patient transfers.

The second floor is dedicated to critical building systems and equipment. This floor houses all main electrical switchgear, HVAC equipment, and plumbing infrastructure — the mechanical backbone that keeps the facility operating seamlessly.

The third floor holds 34 patient rooms dedicated to intensive care, providing specialized monitoring and treatment for the most critical patients. The fourth floor contains 35 medical/surgical rooms designed for patient recovery following procedures and treatment.

Power Infrastructure & Redundancy

A facility of this scale and mission-critical nature requires robust electrical infrastructure designed for zero downtime. Valdosta Electric installed a 2500 kW CAT generator and integrated it seamlessly into TRMC's existing generator control system, ensuring continuous power during utility disruptions. The facility operates on dual-feed transformers from the utility company, providing redundant power sources that automatically switch if either feed is interrupted. Combined with the generator backup system, this multi-layered approach ensures TRMC can deliver uninterrupted care 24/7, regardless of external conditions.

Coordination & Execution

The entire project was designed and coordinated using BIM (Building Information Modeling) software, enabling precise three-dimensional coordination across every trade. This approach minimized conflicts, optimized efficiency, and ensured every system — electrical, mechanical, plumbing, and structural — worked together seamlessly. Valdosta Electric was proud to partner with general contractor JE Dunn to deliver this state-of-the-art healthcare facility to the Tift County community.