Current · 2024–2026 · 134,000 sq ft · three stories · General Contractor: Hoar Construction

South Georgia Medical Center is opening a 134,000-square-foot, three-story addition on the site of two Valdosta landmarks, the former Woodrow Wilson Library and Mathis Auditorium.

The ground floor is built around emergency care: 34 exam rooms and six trauma rooms, three of them equipped with dedicated X-ray capability, alongside a CT scan room and a full kitchen. The second floor is the new home for labor and delivery, with 12 LDR rooms, seven antepartum rooms, eight OB/triage rooms, and two C-section rooms. The third floor houses the postpartum unit — 24 postpartum rooms — along with a 10-bed NICU and eight pediatric rooms.

Valdosta Electric worked with SGMC on an illustrious lighting display as part of the beautification of the new campus: pendant lighting in the new lobby's high ceilings, exterior bollards and uplighting, and the all-new courtyard connecting the addition to the existing Dasher Heart Center.

The building runs on a primary selective, dual-feed service from Georgia Power that switches to an alternate source if a transformer fails, backed by a direct tie into the hospital's emergency generator plant — built by Valdosta Electric in 2013 — over 20,000+ feet of concrete-encased underground feeders. Together, the dual utility feed and generator tie-in give the hospital redundant power no matter what happens upstream.

The entire building was modeled in BIM (Building Information Modeling), with close 3D coordination across every trade to make sure each piece of the puzzle fit — underground, in the walls, and overhead.

Valdosta Electric was glad to work alongside general contractor Hoar Construction to bring this project to completion.