Saxxum – Jacksonville

Feb 2023 – Dec 2024 · 335,000 sq ft · General Contractor: Primus Builders

Valdosta Electric partnered with general contractor Primus Builders on Saxxum's 335,000-square-foot facility in Jacksonville, running from February 2023 to December 2024.

Power Infrastructure

The building is served by two separate 2000 A services, each fed from its own utility transformer for redundancy. The first service runs on a radial feed with a main tie in the switchgear, giving it a second source of power from the utility company if either transformer fails; it feeds lighting loads, dock controllers and chargers, and equipment in the shipping and receiving dock area and cold storage vestibule.

The second 2000 A service and switchboard, fed from the other utility transformer, is backed by a 50 kW generator for emergency egress lighting. This switchboard feeds all of the freezer mechanical equipment, including the blast freezer, along with the office and site lighting.