May 2024 – Jan 2025 · direct to owner
Valdosta Electric worked directly for the owner to provide power and network infrastructure for a new asphalt storage tank addition in Sparks, running from May 2024 to January 2025. The addition holds one asphalt storage tank with a 9,000-ton capacity, with available space on site for a second tank in the future.
Power Infrastructure
Valdosta Electric installed a 1200 A service to a main breaker I-line panel, feeding a 1000 A motor control center. The motor control center in turn feeds the oil heater, the asphalt heater, and all of the associated equipment for the tanks. The 1200 A feed originates at a Georgia Power transformer more than 700 feet from the site; Valdosta Electric installed an underground electrical manhole to pull and splice the conductors over that run.
A companion 1,500-square-foot office and asphalt testing facility was added alongside the tank building, served by its own 300 A service — extending the underground run an additional 300 feet beyond the more-than-700-foot run already in place to reach the tank equipment.
.png)