PB Cold Storage
July 2024 – May 2025 · 183,000 sq ft freezer + 12,000 sq ft office/storage · General Contractor: CMA Plus
Valdosta Electric partnered with general contractor CMA Plus on PB Cold Storage's Valdosta distribution warehouse, running from July 2024 to May 2025. The facility distributes for several of the most recognized ice cream brands, combining a 183,000-square-foot freezer with 12,000 square feet of office and storage space, including a two-story office.
Facility Program
The freezer and its loading docks are split into two groups, totaling four bays and 20 automatic leveler loading docks. A separate machine room houses the ammonia system and pumps that drive the facility's main refrigeration system.
Power Infrastructure
A pad-mounted utility transformer feeds a 3000 A, 480 V, three-phase service to the main switchboard. That switchboard feeds a motor control center serving 18 evaporator units, 6 condenser fans, and 5 glycol system pumps, along with 11 branch circuit panels for lighting and general power. An 80 kW Generac generator and automatic transfer switch were installed solely to back up emergency egress lighting.
Lighting System
The building's lighting runs on RELOC, a pre-manufactured, modular wiring system from Acuity Brands that replaces traditional hardwired conduit and wire for branch circuit power distribution and lighting controls.