Colquitt Regional Medical Center – Facility Expansion
Current — started Aug 2026, projected late summer 2028 · 202,000 sq ft · four stories · General Contractor: Doster Construction
Colquitt Regional Medical Center is adding a 202,000-square-foot, four-story expansion to its Moultrie campus, with construction beginning in August 2026 and completion projected for late summer 2028.
Floor-by-Floor Program
The first floor extends the existing outpatient and PACU sections of the building. It adds six new operating rooms, two of which include provisions for C-section operations, along with a new staff and surgeons' lounge, a central sterile unit, seven postpartum rooms, eight labor and delivery rooms, and a new women's tower lobby and entrance.
The second floor houses 10 FLEX rooms and 30 telemetry patient rooms.
The third and fourth floors are prepped for future expansion and will initially be used for administration and medical supply storage.
Power Infrastructure & Redundancy
The entire new facility is getting a new electrical service from the City of Moultrie Electric Department and a new central energy plant, fed by a dual-feed 4000 amp service. The new central energy plant ties into the existing emergency electrical switchgear to provide the new facility with emergency power. A new 1250 kW diesel generator will be added and tied into the new system.
Coordination & Execution
The project is being designed and coordinated in BIM (Building Information Modeling), with full three-dimensional coordination across every trade so each system is resolved before it is installed — underground, in the walls, and overhead.
Valdosta Electric is excited to work with a new partner as general contractor on this project, Doster Construction.