Cardinal Glass – Adel (Expansion)
Feb 2021 – May 2022 · 13,000 sq ft office addition · General Contractor: Walker Construction
Valdosta Electric partnered with general contractor Walker Construction on a 13,000-square-foot office addition to Cardinal Glass's Adel facility, covering new administration space, a showroom, a training area, a lobby, and a new front entrance. The project ran from February 2021 to May 2022.
Power Infrastructure
Over the same span, Valdosta Electric added a 4000 A switchboard to serve Cardinal Glass's new production line, powering a gantry, cutting table, conveyor system, air float, printer, dryer, and oven.